After a nearly three-month closure due to heavy rains, a portion of Talmo Road in East Hall County has reopened. A metal culvert beneath the road failed Aug. 8, requiring a new box culvert to be installed. Simpson Trucking and Grading completed the work, including installing the 80-foot-long culvert and repaving about 200 feet of roadway, according to a news release from Hall County.
Talmo Road reopened after culvert replacement
![](https://gainesvilletimes.cdn-anvilcms.net/media/images/2017/04/28/images/Default_Image-01.max-1200x675.png)
![Placeholder Image](https://gainesvilletimes.cdn-anvilcms.net/media/images/2017/04/28/images/Default_Image-01.max-752x423.png)